Equipment installation and working process of bottled water production line

The bottled water production line introduces the production line consisting of flushing, filling and glanding. It is suitable for filling 3-5 gallons of round and square barrels. The production line is controlled by gas and electricity program, with interlocking, signal and self. Measuring safety devices. The key components are imported parts with reliable quality. The whole machine is made of high quality stainless steel and meets the hygiene requirements. The structure is reasonable and the operation is convenient. It is the preparation of mineral water, ultra-pure water, space water and distilled water. The whole machine is made of high quality stainless steel, corrosion resistant and easy to clean. The machine has compact structure, small floor space, high work efficiency, stable and reliable, and automatic control. The operator only needs 2 people, which is a fully automatic barreling equipment for the machine and electric trinity.

Bottled water production line equipment installation:
This machine does not need to bury the foot screw. After the equipment is unpacked, the whole machine is placed on a solid and level ground. Then adjust the height of the foot screw and correct the tilt with the spirit level to make the legs evenly stressed. After the equipment is adjusted, connect the water inlet pipe. , sewage pipe, power supply, gas source and fixed.

Working process of bottled water production line :
1. The empty barrel barrel rod is sent into the barrel loading bracket, and the empty barrel gap moves one station. At this time, the empty barrel is inverted and the barrel mouth is washed.
2. There are four processes in the rinsing process: * channel for disinfectant rinsing; second channel for clean water (circulating water); third channel for sterile water (mineral water); fourth channel for drip, after rinsing, 10S Time is used to drip.
3. The rinsed clean bucket rotates 45 degrees down the chain. The bucket slides out by itself and then the bucket is turned up 45 degrees by the bucket cylinder, so that the empty bucket is placed in the filling position, and the top bucket cylinder pushes the bucket out for waiting for filling.
4. The filling valve is automatically pushed into the barrel by the cylinder, and the automatic exhaust filling valve is gradually opened for filling. The filling time is set from the microcomputer, and the filling time can be corrected by using the panel multi-function button according to the liquid level. Reach the good position of zui. After filling to the liquid level, the excess water is returned to the pure water tank through the automatic exhaust port to reduce the waste of pure water.
5. After the filling is completed. The filled barrel is pushed to the gland station by the cylinder of the barrel, and the cover is pressed and output, and the entire filling is completed.




Oral Health Care

Our mission: To protect the health of ear, throat and nose with medical frontier knowledge and technological innovation.
Our vision: Leader in several niche markets of Otolaryngology.
Our values: Change, Enterprising, Share

Electric Tooth Irrigator, Stomatoscope, Electric Toothbrush, Uitrasonic Tooth Cleaner

Ningbo Jiamai Internet Technology CO., Ltd. , https://www.jmcuhyd.com