1. Tools: wrenches, pliers, screwdrivers, hammers, shovel, etc.;
2. Necessary spare parts: various short-circuit chains, links, bolts, nuts, and insurance pins for crushers;
3. Inspection and treatment of lubricating oil and turbine oil:
1. The connecting parts of the motor, reducer, hydraulic coupling, head, tail and other parts must be complete, intact and fastened. The reducer and hydraulic shaft section should be free from oil leakage and oil leakage, and the amount of oil should be appropriate.
2, the signal must be sensitive and reliable, no signal is not allowed to boot. The spray sprinkler should be kept in good condition.
3, the power cable, the operating line must be hung neatly, no compression phenomenon;
4. Coal, vermiculite, sundries, motor and reducer coal dust near the nose must be cleaned and cleaned;
5, the working face scraping conveyor head and the end of the transfer machine should be suitable;
6, the scraper chain plate is moderate, the scraper and screws must be fully tightened;
7, the transfer machine walking trolley must be stable and reliable;
8. When the machine is turned on under the condition of the bridge body, the operation of each part should have no abnormal sound, and the scraper, chain and connecting ring should be free from twisting, twisting and bending deformation;
9. The roadway support at the crusher and the crusher must be intact and firm.
10. The safety protection net and protection device of the crusher should ensure that it does not deform, does not fail, and is safe and reliable;
11. The roadway support at the transfer machine and the crusher must be intact and firm.
Article link: China Pharmaceutical Machinery Equipment Network http://
Introduction to plastic shredder preparation, inspection and treatment
Preparation, inspection and processing of plastic shredders: